# Repair Packer Delivery Inspection: Order vs Equipment

Canonical: https://reliancetrenchless.com/blog/repair-packer-delivery-inspection

Published: 2026-11-17 · Updated: 2026-11-18 · By Reliance Trenchless

Check the model label, supplied components, visible condition and documents before accepting a repair packer. Includes a fillable delivery record.

Check the model label, the packing list, the components in the crate, the visible condition and the documents before the packer leaves receiving. Photograph each difference and write it on one delivery record before anyone signs a clean receipt. This check is a receiving inspection. It does not inflate the packer, approve the fit or replace the installation instructions.

[Reliance repair packers](https://reliancetrenchless.com/products/repair-packers) are available in standard, bypass, long-lateral and wheeled configurations, and the published range covers DN50–1500 for standard models and DN100–1500 for bypass models. The family name does not identify the delivered unit. The order line, the unit label, the physical assembly and the paperwork must all describe the same model and the same supply scope.

## Match labels and order details

Start with the exact model on the order. Read the label on the packer and the packing list, then compare both with the quotation line and the model-table row the quotation cites. If the label is unreadable, do not infer the model from the carton size or a photograph.

| Order record | Compare on the delivered unit | Do not use as proof |
| --- | --- | --- |
| Quotation line | Model, configuration and quantity | A family photograph |
| Packing list | Carton count, loose items and quantity | The carton count alone |
| Model-table row | Suitable pipe range, minimum inner diameter, deflated length, maximum inflation pressure, weight and inflation thread | A nearby model row |
| Confirmed drawing | Length, end connections and wheel arrangement for a custom assembly | A catalogue image |

Table: Comparison records that should agree at delivery. Use this table as a receiving check route rather than an acceptance specification.

The Plugs & Packers spreadsheet's repair-packer table is the row-level record to check. It names suitable pipe range, minimum inner diameter, deflated length, maximum inflation pressure, weight and inflation thread for each RP model [(spreadsheet)](https://reliancetrenchless.com/assets/doc/spreadsheets/Plugs&Packers_Spreadsheet.xlsx). Compare the delivered label and connections directly with that exact row rather than relying on a nearby model or a family statement. The [product page](https://reliancetrenchless.com/products/repair-packers) gives the family range. That range does not confirm the model on the pallet.

Model names and lengths have changed between catalogue revisions. The [selection guide](https://reliancetrenchless.com/resources/how-to-choose-a-pipe-repair-packer) records cases where the current brochure, an archived brochure and the spreadsheet do not agree, including the RP-L 200-300 length and the RP 70-150 and RP 70-120 names. Do not resolve that by choosing the nearest row. Match the revision named in the order and ask for written confirmation if the label and the order line disagree.

Quantity is a separate check. Count packers, wheel sets and any loose components against the packing list. If the order is for a custom length or a special end connection, compare it with the confirmed drawing. A catalogue row does not define a custom assembly.

![Close view of a repair packer end plate showing a central opening, two threaded connections, four wheel brackets and a lifting eye.](https://reliancetrenchless.com/assets/img/Products/RepairPackers/optimized/RepairPackers9-1200.webp)

**End plate and connections on one configuration.** The photograph shows a central opening, two threaded connections, wheel brackets and a lifting eye. It does not identify the model, the ordered thread or a pressure rating. Compare the actual markings and the confirmed drawing. Source: [repair packers](https://reliancetrenchless.com/products/repair-packers).

## Check the supplied components

Open every carton and lay the contents out. Check the packer assembly and the supply scope separately, because a complete-looking packer can still be short of the accessories the job needs.

[The product page](https://reliancetrenchless.com/products/repair-packers) describes an elastic fiber body with metal end panels and wheels on applicable models. Standard and bypass arrangements are different order configurations. The end plate is where that difference is visible, so compare the actual opening and connections with the order. Do not assume that a photograph of a bypass packer represents a non-bypass order, or the reverse.

That page lists a pressure gauge and air hose separately as accessories, so confirm them on the quotation and packing list rather than assuming they are in the crate. The spreadsheet's inflation-thread column is the other connection check. RP 50-90 is listed with 1/4 in. BSP, while RP 500-600 is listed with 1/2 in. BSP. Treat a hose or adapter that does not match the ordered thread as a supply mismatch rather than modifying fittings in the field.

Wheels are part of the description on applicable models, and the product page notes that wheel configuration differs between small and larger packers. Count the wheel assemblies, check that they are mounted at the intended positions, and spin them by hand. Do not force a bent arm or a damaged bearing into service. Record it.

Lay the packing list beside the parts and tick each line. An intact carton seal confirms only that the box remained closed and does not verify that the contents match the list. Mark optional and project-supplied items on the record so nobody treats them as missing from the shipment. The [point repair equipment checklist](https://reliancetrenchless.com/resources/sewer-point-repair-equipment-checklist) separates reusable equipment, materials and project support when the order scope is still being assembled.

![Three repair packers wrapped in clear plastic with separate coiled red hoses and a wrapped package on a factory floor.](https://reliancetrenchless.com/assets/img/Products/RepairPackers/Library/optimized/RepairPackersWrapped2-1280.webp)

**Wrapped packers and separate loose items before packing.** Some items travel outside the packer body, so the packing list defines the accessory set for an order rather than a bench photograph. Source: [repair packers](https://reliancetrenchless.com/products/repair-packers).

## Record visible condition and missing items

Record what you can see before assembly: cuts, gouges, blisters, cured resin, deformed end plates, bent wheel arms, damaged threads, crushed cartons and missing fasteners. Photograph the whole unit and each defect with a scale, and put the carton number, label text and photo file name in the same row.

[UK HSE inspection guidance](https://www.hse.gov.uk/work-equipment-machinery/inspection.htm) says the purpose of an inspection is to identify whether work equipment can be operated, adjusted and maintained safely, with deterioration detected and remedied before it becomes a risk. It also says the result should be recorded and kept at least until the next inspection. The guidance is a general inspection framework. It is not a Reliance acceptance specification. The delivery record is the first entry, and the inspection interval and content still come from your risk assessment and the manufacturer's instructions.

Mark a suspect packer as held. Do not clean, straighten, re-tap or inflate it to make the record look acceptable. Keep it separated from accepted equipment and ask the supplier for a written disposition. This article does not provide an inflation or pressure-test procedure.

| Check | Compare with | Record on site | If it differs |
| --- | --- | --- | --- |
| Carton count and condition | Packing list | Carton IDs, damage and photographs | Hold damaged cartons and notify the supplier |
| Packer quantity | Order and packing list | Count by model | Record the short or excess shipment |
| Model label | Quotation line and model-table row | Exact label text, model and quantity | Hold and ask for written identification |
| Configuration | Order and confirmed drawing | Bypass or non-bypass, wheels and length | Hold and do not convert the assembly |
| End connections | Drawing and spreadsheet row | Thread, opening and fittings | Hold and do not adapt on site |
| Wheel assemblies | Order and drawing | Count, position and free rotation | Record damage or missing parts |
| Body and seams | New-equipment condition and any criteria in the order | Cuts, gouges, blisters, resin and deformation | Photograph and hold for disposition |
| Accessories | Quotation line | Hose, gauge, adapters and other items named in the order | Record missing items |
| Documents | Packing list and order | Packing list, instructions, drawing and any required test or inspection record | Request missing copies |
| Photos and holder | This record | File names, storage location and responsible person | Complete before release |

Table: Blank delivery record for site use. The last column prompts the initial site action while awaiting a supplier disposition. A hold stays in place until the responsible person records the release.

![Row of cardboard cartons of different lengths on a factory floor, with printed labels and a forklift in the background.](https://reliancetrenchless.com/assets/img/Products/RepairPackers/optimized/RepairPackersCartons-1280.webp)

**Cartons staged before shipment.** The cartons carry labels and size marks, but the photograph does not show the contents or prove that they match an order. Check the actual carton labels and count against the packing list. Source: [repair packers](https://reliancetrenchless.com/products/repair-packers).

## Retain the manufacturer documents

Keep one document pack with the equipment: the order confirmation and packing list, the model-table row or revision used to order, the confirmed drawing for a custom configuration, the instructions supplied with the unit, and any inspection or test document the order requires. Give the pack a document number and store it with the equipment record in addition to the purchasing file.

[UK HSE maintenance guidance](https://www.hse.gov.uk/work-equipment-machinery/maintenance.htm) says work equipment should be maintained in an efficient state, in efficient order and in good repair, that a maintenance log should be kept up to date where one exists, and that maintenance work should be planned, ideally using the manufacturer's instructions. These are UK requirements. They are not a global certification or a Reliance acceptance rule. For delivery, keep the instructions and the first condition record with the packer.

Keep the revision you ordered from. If a later brochure or spreadsheet changes a value, do not overwrite the row in the delivery file. Add the new revision and note which document governed the order. If the order requires a certificate or test report, check that it identifies the same model, quantity and identifier as the packing list. This article does not state which documents Reliance issues for a particular order.

Make the record usable. Name the receiver, date, cartons checked, model and unresolved items. "Received in good order" does not tell a maintenance team what was inspected or excluded.

If the label, components or documents do not match, send the delivery record, photographs and the order line to Reliance before the packer is used. Use the [repair packer project enquiry](https://reliancetrenchless.com/contact#product=RepairPackers) for that record, and the [repair packer product guide](https://reliancetrenchless.com/products/repair-packers) for the current family description and document links.

## FAQ: Repair packer delivery inspection

### What should I check first when a repair packer arrives?

Start with the model label and the packing list, then compare both with the quotation line and the model-table row. Count the cartons and packers, and open every carton before signing a clean receipt. Record the result on one delivery sheet with photographs. Do not start with an inflation test. The receiving check is visual and documentary.

### The label shows a different model from the order. Can I accept it?

Do not release it to the job until the difference is resolved in writing. Record the label text, the order line, the carton number and photographs, and ask the supplier whether the label is a revision, a mislabel or a different configuration. A model name from an older catalogue is not proof that the delivered unit matches the order. Keep the packer held and do not relabel it yourself.

### Should I inflate a new repair packer to check it at delivery?

No. This delivery check stops at the visible condition, components and documents. It does not inflate the packer, pressure-test it or approve its fit. If the supplied instructions require an inflation check before use, follow those instructions and the site risk assessment with the specified equipment and competence. A successful inflation would not by itself prove that the model, accessories or documents match the order.

### Which documents should stay with the packer?

Keep the order confirmation, packing list, the model-table row or revision used to order, the confirmed drawing for a custom configuration, the instructions supplied with the unit and any inspection or test document the order requires. Give the set a document number and store it with the equipment record. HSE inspection guidance says inspection results should be recorded and kept at least until the next inspection, so the delivery record becomes the first entry. Do not replace the ordered revision with a later download without noting the change.

## References and source documents

- [Reliance — Repair packers product guide: standard, bypass, long-lateral and wheeled configurations, DN50–1500, end panels, wheels and accessory notes](https://reliancetrenchless.com/products/repair-packers)
- [Reliance — Plugs & Packers spreadsheet: repair-packer table columns and RP 50-90 and RP 500-600 inflation-thread rows](https://reliancetrenchless.com/assets/doc/spreadsheets/Plugs&Packers_Spreadsheet.xlsx)
- [Reliance — How to choose a pipe repair packer: catalogue revision differences, confirmed drawing and supply scope](https://reliancetrenchless.com/resources/how-to-choose-a-pipe-repair-packer)
- [Reliance — Point repair equipment checklist: reusable equipment, materials and project support](https://reliancetrenchless.com/resources/sewer-point-repair-equipment-checklist)
- [UK Health and Safety Executive — Inspection of work equipment: purpose, records and physical evidence (accessed 2026-11-17)](https://www.hse.gov.uk/work-equipment-machinery/inspection.htm)
- [UK Health and Safety Executive — Maintenance of work equipment: maintenance condition, log and manufacturer instructions (accessed 2026-11-17)](https://www.hse.gov.uk/work-equipment-machinery/maintenance.htm)