Video · English
Why a lined pipe still leaks at its ends #shorts
A liner does not bond to the host pipe, so the annulus stays open at the end unless it is sealed. The four records a lining tender asks for.
Application Overview
Short cut of the full explainer; the same end seal, joint seal and pressure-test records apply.
English transcript
From the subtitle track delivered with the video. Refer to the video and product documentation for technical details.
Enterprise trenchless pipe lining starts with a tender, not a trench. The liner is one line item. Four records decide whether it is accepted. Start under the street. The asset is already buried, and the road stays open. A lining contract is judged on what the owner can inspect afterwards. Not on how quickly the crew leaves site. The liner goes down manhole A and runs to manhole B. It is pressed to the host wall and cured in place. One access point, one continuous new pipe, no open cut. The tender photographs the run, then audits the two ends. Record two is the end. The seal is not part of the liner. An EPDM sleeve is pressed to the wall by two stainless bands. Widths are 270, 350 and 500 millimetres, for DN200 to 3000. Watch the full explainer on our channel.
Resources
Product videos
Explainer videos and short demonstrations from Reliance’s official YouTube channels. Browse every published video by topic and follow each one to its reviewed watch page or official YouTube source.
3:11Explainer videos ·
Enterprise Trenchless Pipe Lining: The Four Records
3:16Explainer videos ·
CIPP Pipe Relining: What It Can't Fix, and 4 Checks First
0:55Short demonstrations ·
What can't CIPP pipe relining fix? #shorts
