Video · English

Manhole rehab kit: pump, head and winch, 600–1800 mm

The worm pump mixes and pushes mortar at 40 bar, the spinning head throws it onto a 600–1800 mm wall, and the winch climbs 6 m a minute behind the lining.

30 secEnglish

Application Overview

The 40 bar delivery pressure, 600–1800 mm spray diameter and 0.10 m/s (6 m a minute) winch speed come from the published specification table. Confirm the pump, spray head and material for each manhole.

English transcript

From the subtitle track delivered with the video. Refer to the video and product documentation for technical details.

Manhole rehabilitation equipment: one set, one shaft, no open road. The worm pump pushes the mortar at forty bar. The spinning head sprays a wall six hundred to eighteen hundred millimetres across. The winch climbs at six metres a minute. The mortar is thrown onto the wall, and the new lining is left behind it. One pass, floor to rim. The road stays open.

Resources

Explainer videos and short demonstrations from Reliance’s official YouTube channels. Browse every published video by topic and follow each one to its reviewed watch page or official YouTube source.

All videos